What to know before you commission work

We have gathered the questions that come up before a fit-out, a systems upgrade or the choice of a service contract. The explanations draw on ITTU's experience, so that you can prepare the right information and compare proposals on a like-for-like basis.

Articles

Technical maintenance

How much does technical maintenance of a building cost per month?

Indicative building maintenance costs: from €100/month for a small shop, from €500/month for a hotel, from €700/month for an office building. What drives the price and how to compare proposals.

Read
Fit-out

How much does a shop or office fit-out cost per m²?

A shop or office fit-out typically costs €400–800 per m². What drives the price, what is usually included and how to get an accurate estimate.

Read
Retail fit-out

How long does a shop fit-out in a shopping centre take?

A shop fit-out in a shopping centre usually takes 1.5–3 months. What determines the timeline and how to keep it on track.

Read
Ventilation

How often should ventilation be serviced and filters changed?

Ventilation maintenance frequency in commercial buildings: filter changes, unit servicing, duct cleaning. How to tell that ventilation is underperforming, and what the regulations require.

Read
Fire safety

Which fire safety inspections does the law require of a building owner?

Mandatory fire safety inspections in commercial buildings under Cabinet Regulation No. 238: fire extinguishers, internal fire mains, electrical installations, fire protection systems, staff training.

Read
Construction

General contractor or several contractors: which pays off?

When a single general contractor pays off in a fit-out or refurbishment, and when separate contractors do. Responsibility, timelines, costs and risks.

Read
Construction

What to check when accepting work after construction or refurbishment

What to check before signing the handover certificate: finishes, building systems, as-built documentation, snagging list, warranty.

Read

Coming soon

Retail fit-out

What to send to get a retail fit-out proposal

This article is in preparation.

Office fit-out

How to plan an office refit while people keep working in it

This article is in preparation.

Cooling

What to clarify before replacing an air conditioning system

This article is in preparation.

Ventilation

Will the existing ventilation suit a new floor layout?

This article is in preparation.

Heating

How to prepare a brief for a heating system upgrade

This article is in preparation.

Electrical

What to allow for in the electrical installation before office finishes go in

This article is in preparation.

Water supply and sewerage

Relocating sanitary facilities: what to check before the work

This article is in preparation.

Technical maintenance

What to include in a technical maintenance specification

This article is in preparation.

Building services

How to compare full building service proposals

This article is in preparation.

Partner solutions

When to plan security and audio/video solutions into a project

This article is in preparation.

Facades and roofs

How to prepare a facade or roof repair request

This article is in preparation.

Open Book

How Open Book differs from a fixed-price proposal

This article is in preparation.

Request a quote